Software Testing And Maintenance – December 2010

Part – A

    1. What are the objectives of Testing?
    2. What is meant by black box testing?
    3. What are the objectives of problem tracking system?
    4. What do you mean visible state transition?
    5. What is meant by testing strategy.
    6. How project is assessed?
    7. What do you mean by Test execution?
    8. What are test software changes?
    9. Write the importance of test plan.
    10. Differentiate between reverse engineering and re-engineering.

Part – B

Unit -I

  1. Write short notes on the following :
    1. Regression Testing
    2. Glass box Testing
  2. Discuss about Reporting and analyzing bugs.

Unit -II

  1. What are the characteristics of a good test ? Explain about race condition.
  2. Explain about load testing and error Guessing.

Unit -III

  1. Explain how a software testing methodology is established.
  2. Discuss about eleven steps of software testing process.

Unit -IV

  1. Discuss the following :
    1. Test plan
    2. Acceptance Testing
  2. Explain in detail about Design phase testing.

Unit -V

  1. Discuss about software maintenance and its side effects.
  2. Explain about SCM process and configuration audit.

Attention : This exam questions are converted from the real exam paper to a digital text format by using an OCR Software that may made some mistakes, I reviewed it many times to correct it, But may still there some errors that I missed or misspelled, So if you detect an error or mistake PLEASE report by adding a comment or contact me.